United Security Products AVD-45c Manuel Page 249

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 302
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 248
1/03 UDC 6300 Process Controller Product Manual 235
6.11 Input #5 - Pulse Input Verification
Set up
Refer to Figure 6-8 and wire the controller according to the procedure
given in Table 6-9.
Table 6-9 Pulse Input Verification Setup
Step Action
1
Connect the copper leads from the terminals for Input 5 to the
Frequency Input Generator (Terminals 2 and 3).
2
Apply power and allow the controller to warm up for one hour before
verification.
Figure 6-8 Test Equipment connections for Calibrating Pulse Inputs
22674
1
2
3
4
5
6
7
8
9
10
11
12
13
L1
L2/N
22
23
14
15
16
17
18
19
20
21
+
Frequency
Input
Generator
+
Copper Leads
Verification
Enter the desired Zero and Span frequency range from the Input Generator
and check to see that the displays read the calibrated Zero and Span
values.
Vue de la page 248
1 2 ... 244 245 246 247 248 249 250 251 252 253 254 ... 301 302

Commentaires sur ces manuels

Pas de commentaire